Announcement of the Tendering Contract for the Third Phase of the Resettlement Housing Project of the University Science Park (Phase I Project)

Announcement of the Tendering Contract for the Third Phase of the Resettlement Housing Project of the University Science Park (Phase I Project)
Tender No.: Tender No.: CBL_20170315_1057474703 Time for Bid Opening: Class: Class, Source of Funds:
Jinan Construction Project Bidding Management System
Announcement of the Tendering Contract for the Third Phase of the Resettlement Housing Project of the University Science Park (Phase I Project)
The City's Project Uniform Code: Public Resource Approach Number: 2017JSSG01Z0303 Project Title: University Science and Technology Park Resettlement Housing Phase III Project (Phase I) General Construction Contract Location: University of Science and Technology Park west of Jingfu Expressway, north of Furong Road : State-owned (non-fiscal) investment contribution ratio: 100% Bidding project type: Construction general contracting structure type: Frame shearing project scale: 88848.07 square meter Project document number: Jifafa Investment [2011] No. 327, Jifa Investment [2015] ] No. 300 Planning Permit No.: No. No. of Project Approvals Total Investment: 1.2 Billion Yuan Bidding Project Investment Amount: 200 million Yuan Construction Unit: Jinan Xicheng Investment & Development Group Co., Ltd. Construction Unit Contact Person: Construction Unit Contact Tel: Construction agency: / Contact person: / Representative agency: Tel: / Tenderee: Jinan Xicheng Investment Development Group Co., Ltd. Tender unit Contact person: Tendering unit Tel: Tender agency: Tendering agent Qualification level: Tender agency Project Leader: Gong Xinyun Bidding Agency Co., Ltd. People: Bidding Agent Tel: Announcement Date: 2017/3/16 ~ 2017/3/22 I. Basic Project 1. tender conditions
The general contracting for the third phase of the resettlement housing project of the university science and technology park (the first phase of the project) has been undertaken by the Jinan Development and Reform Commission, with the investment of Jifafa Investment [2011]327, and Jifa Investment [2015] 300. Approved for construction, the bidder was Jinan Xicheng Investment & Development Group Co., Ltd., and the source of construction funds was state-owned (non-financial) investment, and the proportion of the project's investment was 100%. The project has already met the conditions for bidding. The project is now undergoing public bidding for the general contracting of the project.
2. Project overview and scope of tender
2.1 The construction site of this project is: west of Jingfu Expressway of University Science Park and north of Furong Road.
2.2 Construction Scale: The total construction area is 88848.07 square meters, including 21 multi-storey houses. They are all 6 floors above the ground and 1 floor underground residential building.
2.3 Bidding scope: The construction, decoration and installation of the project within the scope of the drawings (including fire engineering, weak current engineering, and solar energy engineering are professional projects). Specific drawings and tender documents, list description shall prevail.
2.4 Investment amount: about 200 million yuan.
2.5 Plan duration: 610 calendar days (specifically starting with Party A)
2.6 Quality Target: Qualified
2.7 Bid division: four bid sections, concurrent investment and concurrent bidding; bid title scale bid content Project type 1: a bid section 6220.06 square meters WE-01, ZZ-01 # residential building construction general contracting 2: two signs Section 11842.97 square meters XL-01, CD-01, CD-02 # residential building construction general contract 3: three bids 24210.36 square meters WE-07, WE-08, WE-09, WE-11, WE-12, WE -13, WE-14, WE-15 # residential building construction general contract 4: four tender sections 46674.68 square meters TS-05, TS-06, TS-07, TS-08, TS-09, TS-10, TS- 11, TS-12 # residential building construction general contracting Second, the tender conditions qualifications bidder qualification requirements
1 This tender requires bidders to have independent legal personality, general construction contractor qualifications of grade one and above, similar engineering experience, and corresponding construction capabilities in personnel, equipment, funds, etc.; The person plans to send the project manager to be qualified as a registered construction professional (specialty in construction engineering) for construction engineering professional grades of Grade A and above, and to have an effective project manager safety production assessment certificate (B certificate), but not to serve other construction project projects. Manager, and registered in this unit;
3 This consortium does not accept consortium;
4 Before the registration deadline stipulated in this announcement, the construction industry companies in Changqing District shall provide the wage certificates for the non-payment of wages owed by the clear account owed by the Changqing District; the registered construction enterprises in the Changqing District of Jinan City shall provide Jinan City The certificate of non-payment of arrears to workers issued by the Qing dynasty office and the certificate of wages for workers without owed wages issued by Qingqing District's outstanding accounts shall be issued; the construction enterprises registered outside Jinan City shall provide proof of the market behavior credit issued by the administrative department in charge of the registration of enterprises and Jinan City. The certificate of the wages of the non-defaulting workers and the certificate of the wages of the non-defaulting workers issued by the Qingqing District will be issued.
5 Bidders and their legal representative, proposed project manager for the past three years (since 2014) can not have a criminal record of bribery.
. Third, the qualified bidders determine the method of tendering more than 15 units (including 15) when the prequalification of qualifications, shortlisted 15 units; bids no more than 15 units (excluding 15) when the qualification after the trial. Fourth, the bid documents to obtain an additional notice Fifth, the bid registration and the need to submit the material Where to participate in bidders, please from March 16, 2017 to March 22, 2017, daily 9:00 am to 11:30 At 13:30 to 16:30 (except statutory holidays), apply.

Contact: Wang Fan

Mobile:

phone

fax

E-mail:

In order to ensure that you can bid smoothly, please consult the bidding agency or the tenderer for detailed requirements for bidding before bidding or purchasing the bidding documents. The specific requirements and project conditions shall be interpreted by the bidding agency or the tenderee.

Next post:Tender invitation notice for the construction of the virtual simulation laboratory reconstruction project of the East Campus of the Zhengzhou Aviation Industry Management Institute, Dongfang District, Shandong Province, China. Previous:35#, 36#, 38#, 39#, Beiyixian Village, Wangguadian Street Office, Feicheng City, Shandong Province #, 40#, 43# Villager Building and Auxiliary Project Tender Announcement
[News Search] [Add to Favorites] [Tell a Friend] [Print this Article] [Report Violation] [Close Window]
Share: QQ space Sina Weibo Tencent Weibo Renren network WeChat
Window._bd_share_config={"common":{"bdSnsKey":{},"bdText":"","bdMini":"2","bdMiniList":false,"bdPic":"","bdStyle":" 0","bdSize":"16"},"share":{"bdSize":16},"image":{"viewList":["qzone","tsina","tqq","renren", "weixin"],"viewText":"Share to:","viewSize":"24"},"selectShare":{"bdContainerClass":null,"bdSelectMiniList":["qzone","tsina","tqq "," renren","weixin"]}};with(document)0[(getElementsByTagName('head')[0]||body).appendChild(createElement('script')).src='http:/ /bdimg.share.baidu.com/static/api/js/share.js?v=89860593.js?cdnversion='+~(-new Date()/36e5)];
Similar information
Total 0 Items [View All] Related Reviews

Recommended Photo
Recommended information
Revitalization of economic policy for the printing and packaging industry brings about a good analysis of the development of new energy vehicles, pain points and solutions. Although "Belt and Road" is an opportunity, new energy vehicle exports should not be rushed. China's new energy vehicles will reach 2 million annual output in 2020 Vehicles or substandard vehicles will be subsidized for more than 50 new energy vehicles. 3D printing will affect 70% of India's automobile sales in 2020. Four giants will jointly develop autopilot platforms. The situation will become increasingly fierce. The analysis of the development of the Japanese construction machinery industry in 2017 The "One Belt, One Road" construction continues to advance. China's manufacturing opportunities and challenges coexist. Die development is difficult. How can the future be?
Click ranking
Tesla installed the battery for the Canadian smart grid to clean energy in the end. Domestic and foreign gaps are still in the way of domestic industrial robots is still a long way to go. Production surges short-circuit still facing the challenges of domestic robots price advantage! The Top Ten Aspects of the New Energy Vehicle Market in 2018 Analyzed Domestic Manufacturing Robots "Made to Manufacturing" and "Intelligent Manufacturing" Showed Significant Growth About Two Questions of Forecast Accuracy 10 Year Two-wheel Production Capacity "Great Leap Forward" Why PV giants take the old road? Plug, power change and wireless, who will dominate the future of electric vehicles? Global polysilicon capacity data and rankings in 2018, these 30 industrial robot manufacturers deserve your attention
Home| About Us| Contact Us| Terms of Use| Copyright Privacy| Site Map| Ranking Promotion| Advertising Service| Point Change| Message| RSS
Customer service: 点击这里给我发消息 Member business: 点击这里给我发消息 Advertising business: 点击这里给我发消息
Var destoon_userid = 0; var destoon_username = ''; var destoon_message = 0; var destoon_chat = 0; var destoon_cart = get_cart(); var destoon_member = ''; var oauth_site = ''; var oauth_user = ''; destoon_member += ( Oauth_user && oauth_site) ?' Welcome, '+oauth_user+' | Bind account | Logout Login' : 'Welcome, Guest | Please Login | Free Registration | Forgot Password?'; $('#destoon_member').html(destoon_member); $('#destoon_cart' ).html(destoon_cart > 0 ? ''+destoon_cart+'' : 0); $(function(){$("img").lazyload();});$('#back2top').click(function( ) { $("html, body").animate({scrollTop:0}, 200); });

Battery BMS

Battery safety is the critical factor that users consider when they are used for different applications. Because of the high reactivity of Lithium Battery, at the heart of each lithium battery pack is a BMS (battery management system) to ensure battery safety. UFO POWER has been in the lithium battery industry for more than ten years. We have our own R&D team and provide Standard BMS and Smart BMS to cater to your specific requirement.

Multiple BMS Function


- Overcharge protection
- Over discharge protection
- Over current protection
- Temperature protection
- Short circuit protection
- Charging balance function
- Cell capacity estimation function

What is a UFO BMS equipped with?


- RS232/RS485 Communication Interfaces
- LED Indicators
- Memory Function
- Dry Contact Function (optional)
- LCD Display Function (optional)

- Total Capacity Function: Total discharge capacity Ah and total discharge energy Wh


UFO Lithium Battery BMS



The Function of Communication Interface

● RS232 Communication Interface
BMS can communicate with the host computer through the RS232 interface, so as to monitor the battery information at the upper computer terminal, including battery voltage, current, temperature, state, SOC, SOH and battery production information, etc.

● RS485 Communication Interface
With RS485 interface, when the LiFePO4 Battery Pack is used in parallel, the main battery pack communicates with the slave battery ack through RS485 communication interface,so all the battery pack information can be viewed through the RS232 on the main Pack.

Battery Bms,Telecommunication Lithium Battery,Solar Battery Bms,48V Lithium-Ion Battery

ShenZhen UFO Power Technology Co., Ltd. , https://www.ufobattery.com

This entry was posted in on